Film-Tech Cinema Systems

STUDIO MOVIE GRILL ARLINGTON
Arlington, TX, USA

Due to construction delays, Brad Miller and Chris Hipp built, wired and pre-tested the sound racks off site in mid-November. General contractors started working on the building in October and opening VIP night was January 13th, 2007 with everything running. The projection install team was not able to start squeezing into the building to start with the initial pulling of wires until the last week of November. From left to right Chris Hipp (projectionist and assistant install), Dwayne Caldwell (projectionist and assistant install), Darren Crimmins (projectionist), Brad Miller (install and service technician), Cory Thornton (AV event operator), Brian Schultz (owner of Studio Movie Grill) and Jeremy Spracklen (projectionist and creator of the SMG preshow entertainment for all locations).

January 2007 photo from the Brad Miller collection.

© 1999-2024 Film-Tech Cinema Systems, LLC. All rights reserved.
www.film-tech.com :: 1.68 :: 2.10